4.3. Sequence of tasks processing |
Top Previous Next |
Tasks are processed in turn beginning with the top of the list. You can change the sequence at any moment and in any direction you want including the top and the bottom of the list. It can be done using the corresponding buttons on the toolbar (Fig. 4.3.1).
Figure 4.3.1 Buttons to move the task in the queue. |